I- 94 BISHOP FORD
I- 94 BISHOP FORD in 6.7 M SE I-57, Cook County, Illinois received a condition grade of B (74/100). Built in 1992, the bridge carries 179K vehicles daily on I- 94 BISHOP FORD over Service Drive.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I- 94 BISHOP FORD is a 34-year-old bridge located 6.7 M SE I-57 in Cook County, Illinois. The bridge carries I- 94 BISHOP FORD over Service Drive with 6 traffic lanes, handling approximately 179K vehicles per day. Built in 1992 and reconstructed in 1993, the structure spans 11.1 meters.
The bridge received a Condition Grade of B (74/100) based on Federal Highway Administration inspection data. Its deck is rated 6/9 (fair), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I- 94 BISHOP FORD has a Condition Score of 74/100 (Grade B). Its deck is rated 6/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I- 94 BISHOP FORD was built in 1992 and reconstructed in 1993, making it 34 years old. The average bridge age in the United States is 48 years.
I- 94 BISHOP FORD carries approximately 179K vehicles per day (average daily traffic). The bridge has 6 traffic lanes. It is 11.1 meters long and located on I- 94 BISHOP FORD in 6.7 M SE I-57, Cook County, Illinois.
No, I- 94 BISHOP FORD is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I- 94 BISHOP FORD is located 6.7 M SE I-57 in Cook County, Illinois. The bridge carries I- 94 BISHOP FORD over Service Drive. Its coordinates are 41.646083, -87.578731. It is maintained by State Highway Agency.
I- 94 BISHOP FORD carries I- 94 BISHOP FORD over Service Drive. The bridge is 11.1 meters long and was built in 1992, with reconstruction in 1993.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.