I90 WB Jayne Adams
I90 WB Jayne Adams in 1.4 M SE Ill 58 P5, Cook County, Illinois received a condition grade of B (69/100). Built in 1958, the bridge carries 150K vehicles daily on I90 WB Jayne Adams over Arlington Hts RD.
I90 WB Jayne Adams carries a B on the BridgeSafety Condition Score with 69/100. Most component ratings are solid; one or two may show wear consistent with the structure’s age, but the bridge is not flagged as structurally deficient.
The bridge was built in 1958 and is now 68 years old, at or past the typical 50-year design life for bridges of its vintage. Maintenance and inspection cycles are correspondingly more involved than for newer structures. I90 WB Jayne Adams carries an average daily traffic count of 150,300 vehicles, with 5 lane(s) crossing Arlington Hts RD. The owning agency is State Toll Authority; bridge inspection records flow into the federal NBI database annually.
Component Ratings
The riding surface, evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I90 WB Jayne Adams is a 68-year-old bridge located 1.4 M SE Ill 58 P5 in Cook County, Illinois. The bridge carries I90 WB Jayne Adams over Arlington Hts RD with 5 traffic lanes, handling approximately 150K vehicles per day. Built in 1958 and reconstructed in 1969, the structure spans 50 meters.
The bridge received a Condition Grade of B (69/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Toll Authority.
Location Map
Frequently Asked Questions
I90 WB Jayne Adams has a Condition Score of 69/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I90 WB Jayne Adams was built in 1958 and reconstructed in 1969, making it 68 years old. The average bridge age in the United States is 48 years.
I90 WB Jayne Adams carries approximately 150K vehicles per day (average daily traffic). The bridge has 5 traffic lanes. It is 50 meters long and located on I90 WB Jayne Adams in 1.4 M SE Ill 58 P5, Cook County, Illinois.
No, I90 WB Jayne Adams is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I90 WB Jayne Adams is located 1.4 M SE Ill 58 P5 in Cook County, Illinois. The bridge carries I90 WB Jayne Adams over Arlington Hts RD. Its coordinates are 42.040544, -87.983783. It is maintained by State Toll Authority.
I90 WB Jayne Adams carries I90 WB Jayne Adams over Arlington Hts RD. The bridge is 50 meters long and was built in 1958, with reconstruction in 1969.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.
Source: FHWA National Bridge Inventory, 2026.