IH 35 S T/A @ OLTO
IH 35 S T/A @ OLTO in 1.3 MI N Of Sh 71, Travis County, Texas received a condition grade of A (85/100). Built in 2021, the bridge carries 185K vehicles daily on IH 35 S T/A @ OLTO over Ih 35 Ml.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
IH 35 S T/A @ OLTO is a 5-year-old bridge located 1.3 MI N Of Sh 71 in Travis County, Texas. The bridge carries IH 35 S T/A @ OLTO over Ih 35 Ml with 1 traffic lane, handling approximately 185K vehicles per day. Built in 2021, the structure spans 65.2 meters.
The bridge received a Condition Grade of A (85/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 8/9 (good), and substructure 8/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
IH 35 S T/A @ OLTO has a Condition Score of 85/100 (Grade A). Its deck is rated 7/9, superstructure 8/9, and substructure 8/9 on the NBI scale. The bridge is not classified as structurally deficient.
IH 35 S T/A @ OLTO was built in 2021, making it 5 years old. The average bridge age in the United States is 48 years.
IH 35 S T/A @ OLTO carries approximately 185K vehicles per day (average daily traffic). The bridge has 1 traffic lane. It is 65.2 meters long and located on IH 35 S T/A @ OLTO in 1.3 MI N Of Sh 71, Travis County, Texas.
No, IH 35 S T/A @ OLTO is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
IH 35 S T/A @ OLTO is located 1.3 MI N Of Sh 71 in Travis County, Texas. The bridge carries IH 35 S T/A @ OLTO over Ih 35 Ml. Its coordinates are 30.233567, -97.741311. It is maintained by State Highway Agency.
IH 35 S T/A @ OLTO carries IH 35 S T/A @ OLTO over Ih 35 Ml. The bridge is 65.2 meters long and was built in 2021.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.