IH35 NB Ent Ramp
IH35 NB Ent Ramp in 0.8 MI N Of Sh 71, Travis County, Texas received a condition grade of A (82/100). Built in 2019, the bridge carries 185K vehicles daily on IH35 NB Ent Ramp over Ih35 NB Exit Ramp.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
IH35 NB Ent Ramp is a 7-year-old bridge located 0.8 MI N Of Sh 71 in Travis County, Texas. The bridge carries IH35 NB Ent Ramp over Ih35 NB Exit Ramp with 1 traffic lane, handling approximately 185K vehicles per day. Built in 2019, the structure spans 221 meters.
The bridge received a Condition Grade of A (82/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 8/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
IH35 NB Ent Ramp has a Condition Score of 82/100 (Grade A). Its deck is rated 7/9, superstructure 7/9, and substructure 8/9 on the NBI scale. The bridge is not classified as structurally deficient.
IH35 NB Ent Ramp was built in 2019, making it 7 years old. The average bridge age in the United States is 48 years.
IH35 NB Ent Ramp carries approximately 185K vehicles per day (average daily traffic). The bridge has 1 traffic lane. It is 221 meters long and located on IH35 NB Ent Ramp in 0.8 MI N Of Sh 71, Travis County, Texas.
No, IH35 NB Ent Ramp is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
IH35 NB Ent Ramp is located 0.8 MI N Of Sh 71 in Travis County, Texas. The bridge carries IH35 NB Ent Ramp over Ih35 NB Exit Ramp. Its coordinates are 30.227800, -97.744350. It is maintained by State Highway Agency.
IH35 NB Ent Ramp carries IH35 NB Ent Ramp over Ih35 NB Exit Ramp. The bridge is 221 meters long and was built in 2019.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.