IH 35 NB UP LEVEL
IH 35 NB UP LEVEL in Downtown Y, Bexar County, Texas received a condition grade of B (67/100). Built in 1993, the bridge carries 173K vehicles daily on IH 35 NB UP LEVEL over S Laredo ST To Guadalupe.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
IH 35 NB UP LEVEL is a 33-year-old bridge located Downtown Y in Bexar County, Texas. The bridge carries IH 35 NB UP LEVEL over S Laredo ST To Guadalupe with 2 traffic lanes, handling approximately 173K vehicles per day. Built in 1993, the structure spans 1004 meters.
The bridge received a Condition Grade of B (67/100) based on Federal Highway Administration inspection data. Its deck is rated 6/9 (fair), superstructure 7/9 (good), and substructure 5/9 (fair).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
IH 35 NB UP LEVEL has a Condition Score of 67/100 (Grade B). Its deck is rated 6/9, superstructure 7/9, and substructure 5/9 on the NBI scale. The bridge is not classified as structurally deficient.
IH 35 NB UP LEVEL was built in 1993, making it 33 years old. The average bridge age in the United States is 48 years.
IH 35 NB UP LEVEL carries approximately 173K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 1004 meters long and located on IH 35 NB UP LEVEL in Downtown Y, Bexar County, Texas.
No, IH 35 NB UP LEVEL is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
IH 35 NB UP LEVEL is located Downtown Y in Bexar County, Texas. The bridge carries IH 35 NB UP LEVEL over S Laredo ST To Guadalupe. Its coordinates are 29.411175, -98.507714. It is maintained by State Highway Agency.
IH 35 NB UP LEVEL carries IH 35 NB UP LEVEL over S Laredo ST To Guadalupe. The bridge is 1004 meters long and was built in 1993.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.