RP NBIR75-WBIR275
RP NBIR75-WBIR275 in .2 MI N Of Ir 275, Hamilton County, Ohio received a condition grade of B (70/100). Built in 1960, the bridge carries 137K vehicles daily on RP NBIR75-WBIR275 over Rmp;N I75 To W I275.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
RP NBIR75-WBIR275 is a 66-year-old bridge located .2 MI N Of Ir 275 in Hamilton County, Ohio. The bridge carries RP NBIR75-WBIR275 over Rmp;N I75 To W I275 with 2 traffic lanes, handling approximately 137K vehicles per day. Built in 1960, the structure spans 114.3 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
RP NBIR75-WBIR275 has a Condition Score of 70/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
RP NBIR75-WBIR275 was built in 1960, making it 66 years old. The average bridge age in the United States is 48 years.
RP NBIR75-WBIR275 carries approximately 137K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 114.3 meters long and located on RP NBIR75-WBIR275 in .2 MI N Of Ir 275, Hamilton County, Ohio.
No, RP NBIR75-WBIR275 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
RP NBIR75-WBIR275 is located .2 MI N Of Ir 275 in Hamilton County, Ohio. The bridge carries RP NBIR75-WBIR275 over Rmp;N I75 To W I275. Its coordinates are 39.292881, -84.441519. It is maintained by State Highway Agency.
RP NBIR75-WBIR275 carries RP NBIR75-WBIR275 over Rmp;N I75 To W I275. The bridge is 114.3 meters long and was built in 1960.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.