INTERSTATE 680
INTERSTATE 680 in 04-Scl-680-M0.18-Sjs, Santa Clara County, California received a condition grade of B (77/100). Built in 1974, the bridge carries 160K vehicles daily on INTERSTATE 680 over Park Service Road.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
INTERSTATE 680 is a 52-year-old bridge located 04-Scl-680-M0.18-Sjs in Santa Clara County, California. The bridge carries INTERSTATE 680 over Park Service Road with 9 traffic lanes, handling approximately 160K vehicles per day. Built in 1974, the structure spans 28 meters.
The bridge received a Condition Grade of B (77/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
INTERSTATE 680 has a Condition Score of 77/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
INTERSTATE 680 was built in 1974, making it 52 years old. The average bridge age in the United States is 48 years.
INTERSTATE 680 carries approximately 160K vehicles per day (average daily traffic). The bridge has 9 traffic lanes. It is 28 meters long and located on INTERSTATE 680 in 04-Scl-680-M0.18-Sjs, Santa Clara County, California.
No, INTERSTATE 680 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
INTERSTATE 680 is located 04-Scl-680-M0.18-Sjs in Santa Clara County, California. The bridge carries INTERSTATE 680 over Park Service Road. Its coordinates are 37.341089, -121.849208. It is maintained by State Highway Agency.
INTERSTATE 680 carries INTERSTATE 680 over Park Service Road. The bridge is 28 meters long and was built in 1974.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.