INTERSTATE 5
INTERSTATE 5 in 07-La-005-22.78-La, Los Angeles County, California received a condition grade of B (70/100). Built in 1961, the bridge carries 264K vehicles daily on INTERSTATE 5 over Gilroy Street.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
INTERSTATE 5 is a 65-year-old bridge located 07-La-005-22.78-La in Los Angeles County, California. The bridge carries INTERSTATE 5 over Gilroy Street with 10 traffic lanes, handling approximately 264K vehicles per day. Built in 1961 and reconstructed in 1974, the structure spans 15.9 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
INTERSTATE 5 has a Condition Score of 70/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
INTERSTATE 5 was built in 1961 and reconstructed in 1974, making it 65 years old. The average bridge age in the United States is 48 years.
INTERSTATE 5 carries approximately 264K vehicles per day (average daily traffic). The bridge has 10 traffic lanes. It is 15.9 meters long and located on INTERSTATE 5 in 07-La-005-22.78-La, Los Angeles County, California.
No, INTERSTATE 5 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
INTERSTATE 5 is located 07-La-005-22.78-La in Los Angeles County, California. The bridge carries INTERSTATE 5 over Gilroy Street. Its coordinates are 34.104892, -118.252850. It is maintained by State Highway Agency.
INTERSTATE 5 carries INTERSTATE 5 over Gilroy Street. The bridge is 15.9 meters long and was built in 1961, with reconstruction in 1974.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.