W60 - N71 CONN
W60 - N71 CONN in 07-La-060-R29.38-Pom, Los Angeles County, California received a condition grade of B (70/100). Built in 1996, the bridge carries 236K vehicles daily on W60 - N71 CONN over Garey AVE.
W60 - N71 CONN carries a B on the BridgeSafety Condition Score with 70/100. Most component ratings are solid; one or two may show wear consistent with the structure’s age, but the bridge is not flagged as structurally deficient.
The bridge was built in 1996, making it 30 years old — past the early-life period but still well within typical service life. Routine inspections and modest repair work are normal for bridges in this age band. W60 - N71 CONN carries an average daily traffic count of 236,000 vehicles, with 2 lane(s) crossing Garey AVE. The owning agency is State Highway Agency; bridge inspection records flow into the federal NBI database annually.
Component Ratings
The riding surface, evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
W60 - N71 CONN is a 30-year-old bridge located 07-La-060-R29.38-Pom in Los Angeles County, California. The bridge carries W60 - N71 CONN over Garey AVE with 2 traffic lanes, handling approximately 236K vehicles per day. Built in 1996, the structure spans 53.8 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 5/9 (fair), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
W60 - N71 CONN has a Condition Score of 70/100 (Grade B). Its deck is rated 5/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
W60 - N71 CONN was built in 1996, making it 30 years old. The average bridge age in the United States is 48 years.
W60 - N71 CONN carries approximately 236K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 53.8 meters long and located on W60 - N71 CONN in 07-La-060-R29.38-Pom, Los Angeles County, California.
No, W60 - N71 CONN is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
W60 - N71 CONN is located 07-La-060-R29.38-Pom in Los Angeles County, California. The bridge carries W60 - N71 CONN over Garey AVE. Its coordinates are 34.024719, -117.749267. It is maintained by State Highway Agency.
W60 - N71 CONN carries W60 - N71 CONN over Garey AVE. The bridge is 53.8 meters long and was built in 1996.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.
Source: FHWA National Bridge Inventory, 2026.