W60 - S71 CONN OC
W60 - S71 CONN OC in 07-La-060-R29.38-Pom, Los Angeles County, California received a condition grade of B (78/100). Built in 1996, the bridge carries 236K vehicles daily on W60 - S71 CONN OC over Garey AVE.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
W60 - S71 CONN OC is a 30-year-old bridge located 07-La-060-R29.38-Pom in Los Angeles County, California. The bridge carries W60 - S71 CONN OC over Garey AVE with 2 traffic lanes, handling approximately 236K vehicles per day. Built in 1996, the structure spans 53.8 meters.
The bridge received a Condition Grade of B (78/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
W60 - S71 CONN OC has a Condition Score of 78/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
W60 - S71 CONN OC was built in 1996, making it 30 years old. The average bridge age in the United States is 48 years.
W60 - S71 CONN OC carries approximately 236K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 53.8 meters long and located on W60 - S71 CONN OC in 07-La-060-R29.38-Pom, Los Angeles County, California.
No, W60 - S71 CONN OC is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
W60 - S71 CONN OC is located 07-La-060-R29.38-Pom in Los Angeles County, California. The bridge carries W60 - S71 CONN OC over Garey AVE. Its coordinates are 34.024119, -117.749006. It is maintained by State Highway Agency.
W60 - S71 CONN OC carries W60 - S71 CONN OC over Garey AVE. The bridge is 53.8 meters long and was built in 1996.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.