2 RGHT LANES I-110
2 RGHT LANES I-110 in 07-La-110-19.52-La, Los Angeles County, California received a condition grade of B (63/100). Built in 1996, the bridge carries 160K vehicles daily on 2 RGHT LANES I-110 over Roadway Fill & Parking.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
2 RGHT LANES I-110 is a 30-year-old bridge located 07-La-110-19.52-La in Los Angeles County, California. The bridge carries 2 RGHT LANES I-110 over Roadway Fill & Parking with 2 traffic lanes, handling approximately 160K vehicles per day. Built in 1996, the structure spans 102.4 meters.
The bridge received a Condition Grade of B (63/100) based on Federal Highway Administration inspection data. Its deck is rated 5/9 (fair), superstructure 5/9 (fair), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
2 RGHT LANES I-110 has a Condition Score of 63/100 (Grade B). Its deck is rated 5/9, superstructure 5/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
2 RGHT LANES I-110 was built in 1996, making it 30 years old. The average bridge age in the United States is 48 years.
2 RGHT LANES I-110 carries approximately 160K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 102.4 meters long and located on 2 RGHT LANES I-110 in 07-La-110-19.52-La, Los Angeles County, California.
No, 2 RGHT LANES I-110 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
2 RGHT LANES I-110 is located 07-La-110-19.52-La in Los Angeles County, California. The bridge carries 2 RGHT LANES I-110 over Roadway Fill & Parking. Its coordinates are 34.012300, -118.280522. It is maintained by State Highway Agency.
2 RGHT LANES I-110 carries 2 RGHT LANES I-110 over Roadway Fill & Parking. The bridge is 102.4 meters long and was built in 1996.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.