5TH ST-S215 ONRAMP
5TH ST-S215 ONRAMP in 08-Sbd-215-7.01-Sbd, San Bernardino County, California received a condition grade of B (70/100). Built in 2013, the bridge carries 162K vehicles daily on 5TH ST-S215 ONRAMP over S215 To 3rd ST Off Ramp.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
5TH ST-S215 ONRAMP is a 13-year-old bridge located 08-Sbd-215-7.01-Sbd in San Bernardino County, California. The bridge carries 5TH ST-S215 ONRAMP over S215 To 3rd ST Off Ramp with 2 traffic lanes, handling approximately 162K vehicles per day. Built in 2013, the structure spans 276 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 5/9 (fair), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
5TH ST-S215 ONRAMP has a Condition Score of 70/100 (Grade B). Its deck is rated 5/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
5TH ST-S215 ONRAMP was built in 2013, making it 13 years old. The average bridge age in the United States is 48 years.
5TH ST-S215 ONRAMP carries approximately 162K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 276 meters long and located on 5TH ST-S215 ONRAMP in 08-Sbd-215-7.01-Sbd, San Bernardino County, California.
No, 5TH ST-S215 ONRAMP is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
5TH ST-S215 ONRAMP is located 08-Sbd-215-7.01-Sbd in San Bernardino County, California. The bridge carries 5TH ST-S215 ONRAMP over S215 To 3rd ST Off Ramp. Its coordinates are 34.105753, -117.302681. It is maintained by State Highway Agency.
5TH ST-S215 ONRAMP carries 5TH ST-S215 ONRAMP over S215 To 3rd ST Off Ramp. The bridge is 276 meters long and was built in 2013.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.