INTERSTATE 215
INTERSTATE 215 in 08-Sbd-215-6.79-Sbd, San Bernardino County, California received a condition grade of B (78/100). Built in 2013, the bridge carries 162K vehicles daily on INTERSTATE 215 over Second Street.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
INTERSTATE 215 is a 13-year-old bridge located 08-Sbd-215-6.79-Sbd in San Bernardino County, California. The bridge carries INTERSTATE 215 over Second Street with 11 traffic lanes, handling approximately 162K vehicles per day. Built in 2013, the structure spans 46.4 meters.
The bridge received a Condition Grade of B (78/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
INTERSTATE 215 has a Condition Score of 78/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
INTERSTATE 215 was built in 2013, making it 13 years old. The average bridge age in the United States is 48 years.
INTERSTATE 215 carries approximately 162K vehicles per day (average daily traffic). The bridge has 11 traffic lanes. It is 46.4 meters long and located on INTERSTATE 215 in 08-Sbd-215-6.79-Sbd, San Bernardino County, California.
No, INTERSTATE 215 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
INTERSTATE 215 is located 08-Sbd-215-6.79-Sbd in San Bernardino County, California. The bridge carries INTERSTATE 215 over Second Street. Its coordinates are 34.102503, -117.301572. It is maintained by State Highway Agency.
INTERSTATE 215 carries INTERSTATE 215 over Second Street. The bridge is 46.4 meters long and was built in 2013.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.