STATE ROUTE 91
STATE ROUTE 91 in 12-Ora-091-2.23-Ana, Orange County, California received a condition grade of B (61/100). Built in 1958, the bridge carries 265K vehicles daily on STATE ROUTE 91 over Euclid Street.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
STATE ROUTE 91 is a 68-year-old bridge located 12-Ora-091-2.23-Ana in Orange County, California. The bridge carries STATE ROUTE 91 over Euclid Street with 9 traffic lanes, handling approximately 265K vehicles per day. Built in 1958 and reconstructed in 2000, the structure spans 49.5 meters.
The bridge received a Condition Grade of B (61/100) based on Federal Highway Administration inspection data. Its deck is rated 6/9 (fair), superstructure 8/9 (good), and substructure 5/9 (fair).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
STATE ROUTE 91 has a Condition Score of 61/100 (Grade B). Its deck is rated 6/9, superstructure 8/9, and substructure 5/9 on the NBI scale. The bridge is not classified as structurally deficient.
STATE ROUTE 91 was built in 1958 and reconstructed in 2000, making it 68 years old. The average bridge age in the United States is 48 years.
STATE ROUTE 91 carries approximately 265K vehicles per day (average daily traffic). The bridge has 9 traffic lanes. It is 49.5 meters long and located on STATE ROUTE 91 in 12-Ora-091-2.23-Ana, Orange County, California.
No, STATE ROUTE 91 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
STATE ROUTE 91 is located 12-Ora-091-2.23-Ana in Orange County, California. The bridge carries STATE ROUTE 91 over Euclid Street. Its coordinates are 33.853925, -117.942039. It is maintained by State Highway Agency.
STATE ROUTE 91 carries STATE ROUTE 91 over Euclid Street. The bridge is 49.5 meters long and was built in 1958, with reconstruction in 2000.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.