STATE ROUTE 86 NB
STATE ROUTE 86 NB in 08-Riv-086-2.01, Riverside County, California received a condition grade of B (63/100). Built in 1979, the bridge carries 153K vehicles daily on STATE ROUTE 86 NB over Calotus Ditch.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
STATE ROUTE 86 NB is a 47-year-old bridge located 08-Riv-086-2.01 in Riverside County, California. The bridge carries STATE ROUTE 86 NB over Calotus Ditch with 2 traffic lanes, handling approximately 153K vehicles per day. Built in 1979, the structure spans 26.2 meters.
The bridge received a Condition Grade of B (63/100) based on Federal Highway Administration inspection data. Its deck is rated 5/9 (fair), superstructure 5/9 (fair), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
STATE ROUTE 86 NB has a Condition Score of 63/100 (Grade B). Its deck is rated 5/9, superstructure 5/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
STATE ROUTE 86 NB was built in 1979, making it 47 years old. The average bridge age in the United States is 48 years.
STATE ROUTE 86 NB carries approximately 153K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 26.2 meters long and located on STATE ROUTE 86 NB in 08-Riv-086-2.01, Riverside County, California.
No, STATE ROUTE 86 NB is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
STATE ROUTE 86 NB is located 08-Riv-086-2.01 in Riverside County, California. The bridge carries STATE ROUTE 86 NB over Calotus Ditch. Its coordinates are 33.448372, -116.082439. It is maintained by State Highway Agency.
STATE ROUTE 86 NB carries STATE ROUTE 86 NB over Calotus Ditch. The bridge is 26.2 meters long and was built in 1979.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.