BridgeSafety
San Diego County, CA · Structure #57 0314

INTERSTATE 5

INTERSTATE 5 in 11-Sd-005-R31.80-Sd, San Diego County, California received a condition grade of C (58/100). Built in 1966, the bridge carries 203K vehicles daily on INTERSTATE 5 over Carmel Mountain RD.

C
58/100
58
Condition Score
203K
Daily Traffic
1966
Year Built
60.3m
Length

Component Ratings

DeckFair
5/9

The riding surface — evaluated for cracking, spalling, and wear

SuperstructureGood
7/9

Beams, girders, and trusses that support the deck

SubstructureFair
5/9

Piers, abutments, and foundations below the deck

Bridge Details

Road
INTERSTATE 5
Crosses Over
Carmel Mountain RD
State
California
County
San Diego County
Location
11-Sd-005-R31.80-Sd
Year Built
1966
Reconstructed
2007
Age
60 years
Daily Traffic
203,000
Lanes
15
Length
60.3 meters
Owner
State Highway Agency
Structure Number
57 0314

About This Bridge

INTERSTATE 5 is a 60-year-old bridge located 11-Sd-005-R31.80-Sd in San Diego County, California. The bridge carries INTERSTATE 5 over Carmel Mountain RD with 15 traffic lanes, handling approximately 203K vehicles per day. Built in 1966 and reconstructed in 2007, the structure spans 60.3 meters.

The bridge received a Condition Grade of C (58/100) based on Federal Highway Administration inspection data. Its deck is rated 5/9 (fair), superstructure 7/9 (good), and substructure 5/9 (fair).

This bridge is owned and maintained by State Highway Agency.

Location Map

11-Sd-005-R31.80-Sd, San Diego County, California

32.917903, -117.234114

Open in Google Maps →

Frequently Asked Questions

INTERSTATE 5 has a Condition Score of 58/100 (Grade C). Its deck is rated 5/9, superstructure 7/9, and substructure 5/9 on the NBI scale. The bridge is not classified as structurally deficient.

INTERSTATE 5 was built in 1966 and reconstructed in 2007, making it 60 years old. The average bridge age in the United States is 48 years.

INTERSTATE 5 carries approximately 203K vehicles per day (average daily traffic). The bridge has 15 traffic lanes. It is 60.3 meters long and located on INTERSTATE 5 in 11-Sd-005-R31.80-Sd, San Diego County, California.

No, INTERSTATE 5 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.

INTERSTATE 5 is located 11-Sd-005-R31.80-Sd in San Diego County, California. The bridge carries INTERSTATE 5 over Carmel Mountain RD. Its coordinates are 32.917903, -117.234114. It is maintained by State Highway Agency.

INTERSTATE 5 carries INTERSTATE 5 over Carmel Mountain RD. The bridge is 60.3 meters long and was built in 1966, with reconstruction in 2007.

Last updated:

Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.