I-95 (SR-9)
I-95 (SR-9) in I-95 / Spring Glen RD., Duval County, Florida received a condition grade of B (69/100). Built in 1965, the bridge carries 144K vehicles daily on I-95 (SR-9) over Spring Glen RD..
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I-95 (SR-9) is a 61-year-old bridge located I-95 / Spring Glen RD. in Duval County, Florida. The bridge carries I-95 (SR-9) over Spring Glen RD. with 6 traffic lanes, handling approximately 144K vehicles per day. Built in 1965 and reconstructed in 1998, the structure spans 54.3 meters.
The bridge received a Condition Grade of B (69/100) based on Federal Highway Administration inspection data. Its deck is rated 6/9 (fair), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I-95 (SR-9) has a Condition Score of 69/100 (Grade B). Its deck is rated 6/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I-95 (SR-9) was built in 1965 and reconstructed in 1998, making it 61 years old. The average bridge age in the United States is 48 years.
I-95 (SR-9) carries approximately 144K vehicles per day (average daily traffic). The bridge has 6 traffic lanes. It is 54.3 meters long and located on I-95 (SR-9) in I-95 / Spring Glen RD., Duval County, Florida.
No, I-95 (SR-9) is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I-95 (SR-9) is located I-95 / Spring Glen RD. in Duval County, Florida. The bridge carries I-95 (SR-9) over Spring Glen RD.. Its coordinates are 30.282500, -81.621389. It is maintained by State Highway Agency.
I-95 (SR-9) carries I-95 (SR-9) over Spring Glen RD.. The bridge is 54.3 meters long and was built in 1965, with reconstruction in 1998.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.