SB I-95 (SR-9)
SB I-95 (SR-9) in 1.60 MI. S Of SR-870, Broward County, Florida received a condition grade of B (75/100). Built in 1971, the bridge carries 123K vehicles daily on SB I-95 (SR-9) over Oakland Park BLVD..
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
SB I-95 (SR-9) is a 55-year-old bridge located 1.60 MI. S Of SR-870 in Broward County, Florida. The bridge carries SB I-95 (SR-9) over Oakland Park BLVD. with 6 traffic lanes, handling approximately 123K vehicles per day. Built in 1971 and reconstructed in 2023, the structure spans 77.2 meters.
The bridge received a Condition Grade of B (75/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
SB I-95 (SR-9) has a Condition Score of 75/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
SB I-95 (SR-9) was built in 1971 and reconstructed in 2023, making it 55 years old. The average bridge age in the United States is 48 years.
SB I-95 (SR-9) carries approximately 123K vehicles per day (average daily traffic). The bridge has 6 traffic lanes. It is 77.2 meters long and located on SB I-95 (SR-9) in 1.60 MI. S Of SR-870, Broward County, Florida.
No, SB I-95 (SR-9) is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
SB I-95 (SR-9) is located 1.60 MI. S Of SR-870 in Broward County, Florida. The bridge carries SB I-95 (SR-9) over Oakland Park BLVD.. Its coordinates are 26.165972, -80.160139. It is maintained by State Highway Agency.
SB I-95 (SR-9) carries SB I-95 (SR-9) over Oakland Park BLVD.. The bridge is 77.2 meters long and was built in 1971, with reconstruction in 2023.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.