NB I-95
NB I-95 in 0.50 MI. S Of SR-870, Broward County, Florida received a condition grade of B (77/100). Built in 1974, the bridge carries 139K vehicles daily on NB I-95 over Prospect RD..
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
NB I-95 is a 52-year-old bridge located 0.50 MI. S Of SR-870 in Broward County, Florida. The bridge carries NB I-95 over Prospect RD. with 7 traffic lanes, handling approximately 139K vehicles per day. Built in 1974 and reconstructed in 2023, the structure spans 55.4 meters.
The bridge received a Condition Grade of B (77/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
NB I-95 has a Condition Score of 77/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
NB I-95 was built in 1974 and reconstructed in 2023, making it 52 years old. The average bridge age in the United States is 48 years.
NB I-95 carries approximately 139K vehicles per day (average daily traffic). The bridge has 7 traffic lanes. It is 55.4 meters long and located on NB I-95 in 0.50 MI. S Of SR-870, Broward County, Florida.
No, NB I-95 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
NB I-95 is located 0.50 MI. S Of SR-870 in Broward County, Florida. The bridge carries NB I-95 over Prospect RD.. Its coordinates are 26.181056, -80.153028. It is maintained by State Highway Agency.
NB I-95 carries NB I-95 over Prospect RD.. The bridge is 55.4 meters long and was built in 1974, with reconstruction in 2023.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.