SB I-95 (SR 9)
SB I-95 (SR 9) in 0.24mi N Of Broward BLVD., Broward County, Florida received a condition grade of A (80/100). Built in 1974, the bridge carries 157K vehicles daily on SB I-95 (SR 9) over North Fork Of New River.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
SB I-95 (SR 9) is a 52-year-old bridge located 0.24mi N Of Broward BLVD. in Broward County, Florida. The bridge carries SB I-95 (SR 9) over North Fork Of New River with 5 traffic lanes, handling approximately 157K vehicles per day. Built in 1974 and reconstructed in 2023, the structure spans 63.1 meters.
The bridge received a Condition Grade of A (80/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 8/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
SB I-95 (SR 9) has a Condition Score of 80/100 (Grade A). Its deck is rated 7/9, superstructure 8/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
SB I-95 (SR 9) was built in 1974 and reconstructed in 2023, making it 52 years old. The average bridge age in the United States is 48 years.
SB I-95 (SR 9) carries approximately 157K vehicles per day (average daily traffic). The bridge has 5 traffic lanes. It is 63.1 meters long and located on SB I-95 (SR 9) in 0.24mi N Of Broward BLVD., Broward County, Florida.
No, SB I-95 (SR 9) is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
SB I-95 (SR 9) is located 0.24mi N Of Broward BLVD. in Broward County, Florida. The bridge carries SB I-95 (SR 9) over North Fork Of New River. Its coordinates are 26.125033, -80.169331. It is maintained by State Highway Agency.
SB I-95 (SR 9) carries SB I-95 (SR 9) over North Fork Of New River. The bridge is 63.1 meters long and was built in 1974, with reconstruction in 2023.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.