SR 91 TPK 53.95
SR 91 TPK 53.95 in 1.7 Miles South Of I-595, Broward County, Florida received a condition grade of A (81/100). Built in 1986, the bridge carries 149K vehicles daily on SR 91 TPK 53.95 over SR 818 & New River Canal.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
SR 91 TPK 53.95 is a 40-year-old bridge located 1.7 Miles South Of I-595 in Broward County, Florida. The bridge carries SR 91 TPK 53.95 over SR 818 & New River Canal with 7 traffic lanes, handling approximately 149K vehicles per day. Built in 1986 and reconstructed in 2008, the structure spans 124.4 meters.
The bridge received a Condition Grade of A (81/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 8/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Toll Authority.
Location Map
Frequently Asked Questions
SR 91 TPK 53.95 has a Condition Score of 81/100 (Grade A). Its deck is rated 7/9, superstructure 8/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
SR 91 TPK 53.95 was built in 1986 and reconstructed in 2008, making it 40 years old. The average bridge age in the United States is 48 years.
SR 91 TPK 53.95 carries approximately 149K vehicles per day (average daily traffic). The bridge has 7 traffic lanes. It is 124.4 meters long and located on SR 91 TPK 53.95 in 1.7 Miles South Of I-595, Broward County, Florida.
No, SR 91 TPK 53.95 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
SR 91 TPK 53.95 is located 1.7 Miles South Of I-595 in Broward County, Florida. The bridge carries SR 91 TPK 53.95 over SR 818 & New River Canal. Its coordinates are 26.065689, -80.215425. It is maintained by State Toll Authority.
SR 91 TPK 53.95 carries SR 91 TPK 53.95 over SR 818 & New River Canal. The bridge is 124.4 meters long and was built in 1986, with reconstruction in 2008.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.