SR-826 PALMETTO
SR-826 PALMETTO in 0.7 Ml W Of Golden Glades, Miami-Dade County, Florida received a condition grade of B (65/100). Built in 1965, the bridge carries 146K vehicles daily on SR-826 PALMETTO over NW 12th & 13th AVE..
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
SR-826 PALMETTO is a 61-year-old bridge located 0.7 Ml W Of Golden Glades in Miami-Dade County, Florida. The bridge carries SR-826 PALMETTO over NW 12th & 13th AVE. with 8 traffic lanes, handling approximately 146K vehicles per day. Built in 1965 and reconstructed in 1986, the structure spans 43.1 meters.
The bridge received a Condition Grade of B (65/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 5/9 (fair), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
SR-826 PALMETTO has a Condition Score of 65/100 (Grade B). Its deck is rated 7/9, superstructure 5/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
SR-826 PALMETTO was built in 1965 and reconstructed in 1986, making it 61 years old. The average bridge age in the United States is 48 years.
SR-826 PALMETTO carries approximately 146K vehicles per day (average daily traffic). The bridge has 8 traffic lanes. It is 43.1 meters long and located on SR-826 PALMETTO in 0.7 Ml W Of Golden Glades, Miami-Dade County, Florida.
No, SR-826 PALMETTO is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
SR-826 PALMETTO is located 0.7 Ml W Of Golden Glades in Miami-Dade County, Florida. The bridge carries SR-826 PALMETTO over NW 12th & 13th AVE.. Its coordinates are 25.927231, -80.221644. It is maintained by State Highway Agency.
SR-826 PALMETTO carries SR-826 PALMETTO over NW 12th & 13th AVE.. The bridge is 43.1 meters long and was built in 1965, with reconstruction in 1986.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.