I-95
I-95 in I-95/Sr112/I-195 Intrchg, Miami-Dade County, Florida received a condition grade of B (71/100). Built in 1962, the bridge carries 179K vehicles daily on I-95 over I-195 WB To I-95 SB.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I-95 is a 64-year-old bridge located I-95/Sr112/I-195 Intrchg in Miami-Dade County, Florida. The bridge carries I-95 over I-195 WB To I-95 SB with 10 traffic lanes, handling approximately 179K vehicles per day. Built in 1962 and reconstructed in 2010, the structure spans 75.3 meters.
The bridge received a Condition Grade of B (71/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I-95 has a Condition Score of 71/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I-95 was built in 1962 and reconstructed in 2010, making it 64 years old. The average bridge age in the United States is 48 years.
I-95 carries approximately 179K vehicles per day (average daily traffic). The bridge has 10 traffic lanes. It is 75.3 meters long and located on I-95 in I-95/Sr112/I-195 Intrchg, Miami-Dade County, Florida.
No, I-95 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I-95 is located I-95/Sr112/I-195 Intrchg in Miami-Dade County, Florida. The bridge carries I-95 over I-195 WB To I-95 SB. Its coordinates are 25.811000, -80.205986. It is maintained by State Highway Agency.
I-95 carries I-95 over I-195 WB To I-95 SB. The bridge is 75.3 meters long and was built in 1962, with reconstruction in 2010.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.