BridgeSafety
Miami-Dade County, FL · Structure #871059

SR 826 NB (871058)

SR 826 NB (871058) in 0.2 MI North Of SR-836, Miami-Dade County, Florida received a condition grade of A (85/100). Built in 2012, the bridge carries 143K vehicles daily on SR 826 NB (871058) over Csxt RR.

A
85/100
85
Condition Score
143K
Daily Traffic
2012
Year Built
35.7m
Length

Component Ratings

DeckGood
8/9

The riding surface — evaluated for cracking, spalling, and wear

SuperstructureGood
7/9

Beams, girders, and trusses that support the deck

SubstructureGood
8/9

Piers, abutments, and foundations below the deck

Bridge Details

Road
SR 826 NB (871058)
Crosses Over
Csxt RR
State
Florida
County
Miami-Dade County
Location
0.2 MI North Of SR-836
Year Built
2012
Age
14 years
Daily Traffic
142,500
Lanes
7
Length
35.7 meters
Owner
State Highway Agency
Structure Number
871059

About This Bridge

SR 826 NB (871058) is a 14-year-old bridge located 0.2 MI North Of SR-836 in Miami-Dade County, Florida. The bridge carries SR 826 NB (871058) over Csxt RR with 7 traffic lanes, handling approximately 143K vehicles per day. Built in 2012, the structure spans 35.7 meters.

The bridge received a Condition Grade of A (85/100) based on Federal Highway Administration inspection data. Its deck is rated 8/9 (good), superstructure 7/9 (good), and substructure 8/9 (good).

This bridge is owned and maintained by State Highway Agency.

Location Map

0.2 MI North Of SR-836, Miami-Dade County, Florida

25.784275, -80.320808

Open in Google Maps →

Frequently Asked Questions

SR 826 NB (871058) has a Condition Score of 85/100 (Grade A). Its deck is rated 8/9, superstructure 7/9, and substructure 8/9 on the NBI scale. The bridge is not classified as structurally deficient.

SR 826 NB (871058) was built in 2012, making it 14 years old. The average bridge age in the United States is 48 years.

SR 826 NB (871058) carries approximately 143K vehicles per day (average daily traffic). The bridge has 7 traffic lanes. It is 35.7 meters long and located on SR 826 NB (871058) in 0.2 MI North Of SR-836, Miami-Dade County, Florida.

No, SR 826 NB (871058) is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.

SR 826 NB (871058) is located 0.2 MI North Of SR-836 in Miami-Dade County, Florida. The bridge carries SR 826 NB (871058) over Csxt RR. Its coordinates are 25.784275, -80.320808. It is maintained by State Highway Agency.

SR 826 NB (871058) carries SR 826 NB (871058) over Csxt RR. The bridge is 35.7 meters long and was built in 2012.

Last updated:

Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.