I 95 SR 9 SB
I 95 SR 9 SB in Between SR 882 And SR 80, Palm Beach County, Florida received a condition grade of B (77/100). Built in 1975, the bridge carries 123K vehicles daily on I 95 SR 9 SB over Summit Boulevard.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I 95 SR 9 SB is a 51-year-old bridge located Between SR 882 And SR 80 in Palm Beach County, Florida. The bridge carries I 95 SR 9 SB over Summit Boulevard with 6 traffic lanes, handling approximately 123K vehicles per day. Built in 1975 and reconstructed in 2008, the structure spans 46.3 meters.
The bridge received a Condition Grade of B (77/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I 95 SR 9 SB has a Condition Score of 77/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I 95 SR 9 SB was built in 1975 and reconstructed in 2008, making it 51 years old. The average bridge age in the United States is 48 years.
I 95 SR 9 SB carries approximately 123K vehicles per day (average daily traffic). The bridge has 6 traffic lanes. It is 46.3 meters long and located on I 95 SR 9 SB in Between SR 882 And SR 80, Palm Beach County, Florida.
No, I 95 SR 9 SB is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I 95 SR 9 SB is located Between SR 882 And SR 80 in Palm Beach County, Florida. The bridge carries I 95 SR 9 SB over Summit Boulevard. Its coordinates are 26.665978, -80.071122. It is maintained by State Highway Agency.
I 95 SR 9 SB carries I 95 SR 9 SB over Summit Boulevard. The bridge is 46.3 meters long and was built in 1975, with reconstruction in 2008.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.