I 95 SR 9
I 95 SR 9 in 0.25 Mile North Of SR 786, Palm Beach County, Florida received a condition grade of A (85/100). Built in 1986, the bridge carries 143K vehicles daily on I 95 SR 9 over Military Trail.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I 95 SR 9 is a 40-year-old bridge located 0.25 Mile North Of SR 786 in Palm Beach County, Florida. The bridge carries I 95 SR 9 over Military Trail with 12 traffic lanes, handling approximately 143K vehicles per day. Built in 1986 and reconstructed in 2011, the structure spans 115.4 meters.
The bridge received a Condition Grade of A (85/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 8/9 (good), and substructure 8/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I 95 SR 9 has a Condition Score of 85/100 (Grade A). Its deck is rated 7/9, superstructure 8/9, and substructure 8/9 on the NBI scale. The bridge is not classified as structurally deficient.
I 95 SR 9 was built in 1986 and reconstructed in 2011, making it 40 years old. The average bridge age in the United States is 48 years.
I 95 SR 9 carries approximately 143K vehicles per day (average daily traffic). The bridge has 12 traffic lanes. It is 115.4 meters long and located on I 95 SR 9 in 0.25 Mile North Of SR 786, Palm Beach County, Florida.
No, I 95 SR 9 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I 95 SR 9 is located 0.25 Mile North Of SR 786 in Palm Beach County, Florida. The bridge carries I 95 SR 9 over Military Trail. Its coordinates are 26.844444, -80.105056. It is maintained by State Highway Agency.
I 95 SR 9 carries I 95 SR 9 over Military Trail. The bridge is 115.4 meters long and was built in 1986, with reconstruction in 2011.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.