RAMP TO I 25 SBND
RAMP TO I 25 SBND in .2 MI N I76; .1 MI W I25, Adams County, Colorado received a condition grade of B (78/100). Built in 1992, the bridge carries 121K vehicles daily on RAMP TO I 25 SBND over Clear Creek R.
RAMP TO I 25 SBND carries a B on the BridgeSafety Condition Score with 78/100. Most component ratings are solid; one or two may show wear consistent with the structure’s age, but the bridge is not flagged as structurally deficient.
The bridge was built in 1992, making it 34 years old — past the early-life period but still well within typical service life. Routine inspections and modest repair work are normal for bridges in this age band. RAMP TO I 25 SBND carries an average daily traffic count of 121,000 vehicles, with 2 lane(s) crossing Clear Creek R. The owning agency is State Highway Agency; bridge inspection records flow into the federal NBI database annually.
Component Ratings
The riding surface, evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
RAMP TO I 25 SBND is a 34-year-old bridge located .2 MI N I76; .1 MI W I25 in Adams County, Colorado. The bridge carries RAMP TO I 25 SBND over Clear Creek R with 2 traffic lanes, handling approximately 121K vehicles per day. Built in 1992, the structure spans 96.2 meters.
The bridge received a Condition Grade of B (78/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
RAMP TO I 25 SBND has a Condition Score of 78/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
RAMP TO I 25 SBND was built in 1992, making it 34 years old. The average bridge age in the United States is 48 years.
RAMP TO I 25 SBND carries approximately 121K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 96.2 meters long and located on RAMP TO I 25 SBND in .2 MI N I76; .1 MI W I25, Adams County, Colorado.
No, RAMP TO I 25 SBND is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
RAMP TO I 25 SBND is located .2 MI N I76; .1 MI W I25 in Adams County, Colorado. The bridge carries RAMP TO I 25 SBND over Clear Creek R. Its coordinates are 39.820367, -104.984125. It is maintained by State Highway Agency.
RAMP TO I 25 SBND carries RAMP TO I 25 SBND over Clear Creek R. The bridge is 96.2 meters long and was built in 1992.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.
Source: FHWA National Bridge Inventory, 2026.