I 515 US95 US93
I 515 US95 US93 in Las Vegas, Clark County, Nevada received a condition grade of A (85/100). Built in 1981, the bridge carries 147K vehicles daily on I 515 US95 US93 over Sr590 Desert Inn RD.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I 515 US95 US93 is a 45-year-old bridge located Las Vegas in Clark County, Nevada. The bridge carries I 515 US95 US93 over Sr590 Desert Inn RD with 8 traffic lanes, handling approximately 147K vehicles per day. Built in 1981 and reconstructed in 2022, the structure spans 51.5 meters.
The bridge received a Condition Grade of A (85/100) based on Federal Highway Administration inspection data. Its deck is rated 8/9 (good), superstructure 8/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I 515 US95 US93 has a Condition Score of 85/100 (Grade A). Its deck is rated 8/9, superstructure 8/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I 515 US95 US93 was built in 1981 and reconstructed in 2022, making it 45 years old. The average bridge age in the United States is 48 years.
I 515 US95 US93 carries approximately 147K vehicles per day (average daily traffic). The bridge has 8 traffic lanes. It is 51.5 meters long and located on I 515 US95 US93 in Las Vegas, Clark County, Nevada.
No, I 515 US95 US93 is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I 515 US95 US93 is located Las Vegas in Clark County, Nevada. The bridge carries I 515 US95 US93 over Sr590 Desert Inn RD. Its coordinates are 36.129611, -115.088897. It is maintained by State Highway Agency.
I 515 US95 US93 carries I 515 US95 US93 over Sr590 Desert Inn RD. The bridge is 51.5 meters long and was built in 1981, with reconstruction in 2022.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.