I-15NB COL-DIST.RP
I-15NB COL-DIST.RP in I15 I80 Sr201 Int.@2400 S, Salt Lake County, Utah received a condition grade of B (78/100). Built in 2000, the bridge carries 268K vehicles daily on I-15NB COL-DIST.RP over Drainage Water Ret. Pond.
I-15NB COL-DIST.RP carries a B on the BridgeSafety Condition Score with 78/100. Most component ratings are solid; one or two may show wear consistent with the structure’s age, but the bridge is not flagged as structurally deficient.
The bridge was built in 2000, making it 26 years old — past the early-life period but still well within typical service life. Routine inspections and modest repair work are normal for bridges in this age band. I-15NB COL-DIST.RP carries an average daily traffic count of 268,370 vehicles, with 3 lane(s) crossing Drainage Water Ret. Pond. The owning agency is State Highway Agency; bridge inspection records flow into the federal NBI database annually.
Component Ratings
The riding surface, evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
I-15NB COL-DIST.RP is a 26-year-old bridge located I15 I80 Sr201 Int.@2400 S in Salt Lake County, Utah. The bridge carries I-15NB COL-DIST.RP over Drainage Water Ret. Pond with 3 traffic lanes, handling approximately 268K vehicles per day. Built in 2000, the structure spans 61.5 meters.
The bridge received a Condition Grade of B (78/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 7/9 (good), and substructure 7/9 (good).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
I-15NB COL-DIST.RP has a Condition Score of 78/100 (Grade B). Its deck is rated 7/9, superstructure 7/9, and substructure 7/9 on the NBI scale. The bridge is not classified as structurally deficient.
I-15NB COL-DIST.RP was built in 2000, making it 26 years old. The average bridge age in the United States is 48 years.
I-15NB COL-DIST.RP carries approximately 268K vehicles per day (average daily traffic). The bridge has 3 traffic lanes. It is 61.5 meters long and located on I-15NB COL-DIST.RP in I15 I80 Sr201 Int.@2400 S, Salt Lake County, Utah.
No, I-15NB COL-DIST.RP is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
I-15NB COL-DIST.RP is located I15 I80 Sr201 Int.@2400 S in Salt Lake County, Utah. The bridge carries I-15NB COL-DIST.RP over Drainage Water Ret. Pond. Its coordinates are 40.720911, -111.903567. It is maintained by State Highway Agency.
I-15NB COL-DIST.RP carries I-15NB COL-DIST.RP over Drainage Water Ret. Pond. The bridge is 61.5 meters long and was built in 2000.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.
Source: FHWA National Bridge Inventory, 2026.