RP.I15NB to I215EB
RP.I15NB to I215EB in 400 W.6400 So.In Murray, Salt Lake County, Utah received a condition grade of B (70/100). Built in 1998, the bridge carries 247K vehicles daily on RP.I15NB to I215EB over Lt.Rail Spur & 6400 S.ST.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
RP.I15NB to I215EB is a 28-year-old bridge located 400 W.6400 So.In Murray in Salt Lake County, Utah. The bridge carries RP.I15NB to I215EB over Lt.Rail Spur & 6400 S.ST with 2 traffic lanes, handling approximately 247K vehicles per day. Built in 1998, the structure spans 190.7 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 7/9 (good), superstructure 6/9 (fair), and substructure 6/9 (fair).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
RP.I15NB to I215EB has a Condition Score of 70/100 (Grade B). Its deck is rated 7/9, superstructure 6/9, and substructure 6/9 on the NBI scale. The bridge is not classified as structurally deficient.
RP.I15NB to I215EB was built in 1998, making it 28 years old. The average bridge age in the United States is 48 years.
RP.I15NB to I215EB carries approximately 247K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 190.7 meters long and located on RP.I15NB to I215EB in 400 W.6400 So.In Murray, Salt Lake County, Utah.
No, RP.I15NB to I215EB is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
RP.I15NB to I215EB is located 400 W.6400 So.In Murray in Salt Lake County, Utah. The bridge carries RP.I15NB to I215EB over Lt.Rail Spur & 6400 S.ST. Its coordinates are 40.631017, -111.902311. It is maintained by State Highway Agency.
RP.I15NB to I215EB carries RP.I15NB to I215EB over Lt.Rail Spur & 6400 S.ST. The bridge is 190.7 meters long and was built in 1998.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.