RP.I-215EBtoI-15SB
RP.I-215EBtoI-15SB in 0.2 MI.So.6400 South ST., Salt Lake County, Utah received a condition grade of B (70/100). Built in 1998, the bridge carries 247K vehicles daily on RP.I-215EBtoI-15SB over Union Pacific Railroad.
Component Ratings
The riding surface — evaluated for cracking, spalling, and wear
Beams, girders, and trusses that support the deck
Piers, abutments, and foundations below the deck
Bridge Details
About This Bridge
RP.I-215EBtoI-15SB is a 28-year-old bridge located 0.2 MI.So.6400 South ST. in Salt Lake County, Utah. The bridge carries RP.I-215EBtoI-15SB over Union Pacific Railroad with 2 traffic lanes, handling approximately 247K vehicles per day. Built in 1998 and reconstructed in 2019, the structure spans 213.2 meters.
The bridge received a Condition Grade of B (70/100) based on Federal Highway Administration inspection data. Its deck is rated 6/9 (fair), superstructure 7/9 (good), and substructure 6/9 (fair).
This bridge is owned and maintained by State Highway Agency.
Location Map
Frequently Asked Questions
RP.I-215EBtoI-15SB has a Condition Score of 70/100 (Grade B). Its deck is rated 6/9, superstructure 7/9, and substructure 6/9 on the NBI scale. The bridge is not classified as structurally deficient.
RP.I-215EBtoI-15SB was built in 1998 and reconstructed in 2019, making it 28 years old. The average bridge age in the United States is 48 years.
RP.I-215EBtoI-15SB carries approximately 247K vehicles per day (average daily traffic). The bridge has 2 traffic lanes. It is 213.2 meters long and located on RP.I-215EBtoI-15SB in 0.2 MI.So.6400 South ST., Salt Lake County, Utah.
No, RP.I-215EBtoI-15SB is not classified as structurally deficient. All three primary components (deck, superstructure, and substructure) are rated above 4 on the 0-9 NBI scale.
RP.I-215EBtoI-15SB is located 0.2 MI.So.6400 South ST. in Salt Lake County, Utah. The bridge carries RP.I-215EBtoI-15SB over Union Pacific Railroad. Its coordinates are 40.629386, -111.903858. It is maintained by State Highway Agency.
RP.I-215EBtoI-15SB carries RP.I-215EBtoI-15SB over Union Pacific Railroad. The bridge is 213.2 meters long and was built in 1998, with reconstruction in 2019.
Condition Score is calculated from deck (33%), superstructure (33%), and substructure (34%) NBI ratings with an age penalty for bridges over 50 years.